Plant Relocation

Dismantling and plant relocation and re-activation in the new location or plant re-operation for a plant that has been hiatus for a long time.

CAPABILITY AND EXCELLENCE

  1. Competent manpower.
  2. Experience
  3. Supported by a strong Holding engineering.
  4. Tools that are used:
    • Vibration Measurement Analysis
    • Ultrasonic Thickness
    • High Pressure Water Pump
    • General Tools
    • Infra-Red Thermometer
    • Merger Test
    • Power Quality
    • Smoke Analyzer/Detector
    • Decibel meter
    • Multi tester